Stage 02 - Substructure

02. Substructure

Lying the foundation and underground utilities. 

Digging for the foundation and installing the iron bar. 

Doing the excavation, installing footings, pouring concrete for a slab. Basement and waterproofing will be done once the raised-up floor is ready. Can be seen the 6ft septic tank is ready.



Footing Works